Deployment

Deployment Strategy

 

Dependencies

 

Communication

 

Deployment Checklists

Application checklist

 

Component

Success Criteria

Project Stage Required (Agile)

OK (Y/N) Reviewed by (date) Outdstanding Actions (Who)

Implementation Plan

Feedback from previous test implementations completed and successful full implementation undertaken for UAT

DSOR (Release 1-n)

Y Change-based feed and Self-Reg UAT signed off HB 07/02/2017  

Implementation Risk Assessment

A risk assessment has been undertaken for the Implementation Plan and selected deployment dates. (e.g. roll back)

ASOR (Release 1-n)

Y HB 07/02/2017  

TAD/Operaional Document

Documentation complete

Action: The Document must be copied to the Wiki

 

Y HB 30/11/20016  

System Design Specification (SDS)

Document complete and accurate.

 

Action: The Document must be copied to the Wiki

ASOR (Final Release  / Handover)

Y HB 30/11/2016  

System Description Document

Document complete and accurate.

 

Action: The Document must be copied to the Wiki

ASOR (Final Release  / Handover)

   

Existing System Description Document update in progress to include Self Reg UI. DevTeam

Scalability/Load Testing

Adequate load testing has taken place. The results have been recorded and analysed to ensure that the application will cope with the anticipated load.

ASOR (Final Release  / Handover)

Y HB 07/02/2017  

Performance

The application has been tested against stated performance criteria. Performance has been assured by user and support staff testing.

ASOR (Final Release  / Handover)

Y HB 07/02/2017  

Source Code

 

Source control must be checked out till go-live and checked-in after go live

Source code has been secured with SVN or other source control tool.

Action: ensure Production Branch created

Where code is provided by a third party (e.g. supplier) it has been established who is responsible to maintain source code

 

DSOR (Final Release  / Handover)

Y Locations stored in Tech Collab WIKI HB 21/12/2016  

Configuration Management Database

The relevant details regarding new or changed infrastructure components have been added to the CMDB in unidesk

ASOR (Release 1-n)

Y HB 20/02/2017  

Change Control(s)

A Change & Release record  has been created in unidesk for the LIVE implementation request.

 Action: record unidesk number

ASOR / (Release 1-n)

Y

C1512-125

HB 21/12/2016  

Test Log Review

A review of the test log (JIRA) has taken place to ensure all required actions have been completed.   If this is not the case, then confirmation on criticality of outstanding issues and action plan for resolution is required.

ASOR (Final Release  / Handover)

Y HB 07/02/2017  

Production Management Handover

Handover to Applications Management and Technology Management is completed or arranged and the teams are in position to support the application post deployment.

Action: record handover dates

ASOR (Final Release  / Handover)

Generic Microservices and OAuth handover complete.    

SR UI and Change-based feed handover scheduled.

Support Accounts

Read access accounts or update current read access accounts have been set up for support staff(requires business owner approval)

ASOR (Final Release  / Handover)

Y HB 30/11/2016  

Password Management (Password Manager Pro)

Password Manager Pro has been updated with all relevant account details including external supplier  accounts

ASOR (Release 1-n)

Y HB 30/11/2016  

Environment comparison

Database comparison between TEST and LIVE (might be required before and after go-live)

ASOR (Final Release  / Handover)

N/A New system HB 30/11/2016  

Client requirements

Does the application have specific client requirements, such as JVM/JRE versions, JInitiator etc

If so have these requirements been raised with Desktop services

Wiki pages to be updated:

[1] https://www.wiki.ed.ac.uk/display/insite/Corporate+applications+with+client+based+requirements

[2] https://www.wiki.ed.ac.uk/display/insite/Client+side+requirements+for+corporate+applications

ASOR (Release 1-n)

N/A HB 30/11/2016  

Technologies

Is there any new software or technologies involved? (Y/N)

If yes state any additional actions taken to ensure adequate handover to the production support team

ASOR (Release 1-n)

Y Generic Microservices handoever complete. HB 07/02/2017    

Access outside University

By default all web based applications are accessible outside University without use of VPN etc Wiki list

If not accessible from outside University this needs to be approved by Production Management.

ASOR (Release 1-n)

Y HB 30/11/2016  

Vendor Access Required

Does vendor require db/app access (Y/N)

If yes, ensure access details are in TAD

ASOR (Final Release  / Handover)

N/A Internal development HB 30/11/2016  

Certificates

All changes to certificates or new certificates for this service have to be added to the certificate master list. The certificate master list is being managed by Applications Management This includes TEST and LIVE certificates and records type of certificate and expiry dates.

ASOR (Final Release  / Handover)

Y HB 11/01/2017 Certificates added  

Deployment Date(s)

Agreed date has been confirmed that allows adequate time for completion of Acceptance Sign Off Review.

ASOR (Final Release  / Handover)

Y HB 07/02/2017  

Deployment Resources

IS and business area resources required for deployment, including those needed for post implementation checking and sign off have been secured.

ASOR (Final Release  / Handover)

Y HB 07/02/2017  

Deployment Ownership

Responsibilities for managing the go-live, including: comms with service owner and end users, ensuring go live timescales are met, managing issues arising and managing comms between all teams involved in go live.

ASOR (Final Release  / Handover)

Y HB 30/11/2016  

Service Announcement(s)

A Service announcement has been raised with the agreed deployment date on the alert system:

 

http://reports.is.ed.ac.uk/alerts/

 

Service announcements should be raised by Project Manager 10 days before go live, but no later than 4 days.

ASOR (Release 1-n)

Y HB 07/02/2017  

Reporting and Analytics

New BI Universes or substantial changes to Universes/report offerings need to be documented in the Information Portal managed by GaSP.

https://www.wiki.ed.ac.uk/display/IP/Information+Portal+Home

ASOR (Release 1-n)

N/A HB 30/11/2016  

Infrastructure checklist

 

Component

Success Criteria

Project Stage Required (Agile)

OK (Y/N) Reviewed by (date) Outdstanding Actions (Who)

Technical Architecture/Operational Document(TAD)

Documentation complete and accurately reflects the environment subjected to UAT.

 

ASOR (Release 1-n)

Y HB 11/01/2017 TAD updated to include: 1) IDM change feed crons 2) libreg certificates 3)libregs start/Stop scripts 4)Self Reg UI log files 5) Self Reg Load balancing.  

Security

All security requirements, e.g. SSL encryption, IP based restrictions firewall requirements have been specified, tested and implemented in LIVE

ASOR (Release 1-n)

Y HB 30/11/2016  

User Accounts

         

Patching

Ensure that all applications have an agreed patching schedule and this schedule is agreed with service owners. Different technologies have different patching strategies:

Oracle, Windows, Linux

ASOR (Final Release  / Handover)

Y HB 30/11/2016  

Start/Stop scripts

Are Server Start-up/Shutdown scripts in place?

Including start-up procedure documented, enabled and tested

ASOR (Release 1-n)

Y TAD updates HB 11/01/2017  

Ports

Port allocation file been updated:

 

https://www.wiki.ed.ac.uk/display/insite/Port+Allocation+on+Unix+Servers

ASOR (Release 1-n)

N/A HB 30/11/2016  

Backup and Recovery

All backups as noted in the TAD need to be confirmed operational.

 

A test recovery of user data needs to be done to validate the integrity of the recovery mechanism and process.

ASOR (Release 1-n)

Y HB 20/02/2017 System uses existing GENLIVE database.  

DR Copy

DR copy to SECONDARY DB configured and tested (unless existing database which is already setup).

ASOR/Release1

Y HB 20/02/2017 System uses existing infrastructure.  

Logs

For all logs the following is in place:

  • Logs are rotated and old logs are archived or deleted to ensure server space is not reached

  • In production only minimal levels of logging is switched on (debug may be adequate on DEV, but not on Production)

ASOR (Release 1-n)

Y HB 11/01/2017 SelfReg UI log locations detailed in TAD.  

 Support checklist

 

Component

Success Criteria

 Project Stage Required (Agile)

OK (Y/N) Reviewed by (date) Outdstanding Actions (Who)

Support Agreement (including any charging arrangements)

A support agreement OLA is in place for any new applications – including any hosting or support charges. Where external suppliers are involved an SLA should be in place as well.

 

Action: SLA  moved to wiki:

 

https://www.wiki.ed.ac.uk/display/insite/SLA+repository+-+Applications+Management

ASOR (Final Release  / Handover)

Y

OLA arranged by A Heyn.

HB 20/02/2017

 

Time Recording Code

A Time Recording code for the application, if required, has been confirmed and set up (in ASTA)

Action: Does application require a separate entry for business area in ASTA

ASOR (Final Release  / Handover)

Y HB 20/02/2017Existing LMPS01 code will be used with additional budget if necessary.  

Disaster Recovery and Business Continuity

Appropriate DR/BC provision is in place and has been fully tested. Application DR/BC details have been transferred to the DR Portfolio and DR level (1, 2 or 3) has been agreed

ASOR (Release 1-n)

Y HB 30/11/2016  

Test Environment

An adequate TEST environment has been established for the application which may be used by support to test future changes prior to releasing these in the LIVE environment.

ASOR (Release 1-n)

Y HB 30/11/2016  

Hardware and Software Licensing

All required licensing is in place including maintenance/support arrangements with external suppliers.

ASOR (Final Release  / Handover)

N/A HB 30/11/2016  

Browser Compatibility

Browser compatibility has been tested and compatibility information updated

See

http://www.ed.ac.uk/schools-departments/information-services/services/computing/application-development/application-support/supported-web-browsers/browser-application

 for details

ASOR (Final Release  / Handover)

Y Tested via Library staff UAT HB 07/02/2017  

Portal Compatibility

Portal compatibility, where required, has been confirmed the Portals Service Owner.

ASOR (Final Release  / Handover)

N/A HB 30/11/2016  

Help Desk

The new application is recognised with the UniDesk (A business contact queue is defined where initial calls are raised with)

ASOR (Final Release  / Handover)

Y Existing Library process HB .

User Guide Documentation

Appropriate documentation has been produced for users of the new application.

ASOR (Final Release  / Handover)

  HB 11/01/2017 Library team arranging training and documentation.  

Training Material

Training material, if required, has been produced and is of an appropriate standard.

ASOR (Final Release  / Handover)

Y Training via Library Services HB 30/11/2016 Training material can be found on

U:\ISG\EULMGShared\LIBSTAFF\IS Helpdesk\Swipe cards for externals instructions or WIKI page https://www.wiki.ed.ac.uk/display/ISHelpdeskWiki/LMP006+Training+materials+and+FAQs

 

Demonstration or Walkthrough

Demonstration or walkthrough of the new application has taken place for other stakeholder.

ASOR (Final Release  / Handover)

Y HB 30/11/2016  

Web Sites and Other Document Sources

External and internal web sites have been reviewed to ensure that all application references are present, correct and up to date.

ASOR (Final Release  / Handover)

Y HB 30/11/2016