Deployment
-
Deployment Strategy
-
Dependencies
-
Communication
-
Deployment Checklists
Application checklist
|
Component |
Success Criteria |
Project Stage Required (Agile) |
OK (Y/N) | Reviewed by (date) | Outstanding Actions (Who) |
|---|---|---|---|---|---|
|
Implementation Plan (including Rollback plan) |
Implementation plan has been followed to deploy to Test and updated in case of issues found Rollback plan has been documented. |
DSOR (Release 1-n) |
N/A | Ron McLeod 11/06/2019 | Saas solution. Implemented by vendor, ICES |
|
Implementation Risk Assessment |
A risk assessment has been undertaken for the Implementation Plan and selected deployment dates. |
ASOR (Release 1-n) |
N/A | Ron McLeod 11/06/2019 | |
|
TAD/Operational Document |
Documentation complete and uploaded to Sharepoint site. https://uoe.sharepoint.com/sites/disasterrecoveryplans/SitePages/Home.aspx Action: The Document must be copied to the Wiki or linked to the Sharepoint site. |
ASOR (Release 1-n) |
Requested PM to get devtech resource | ||
| Update End Of Life (EOL) spreadsheet |
Review EOL spreasheet to ensure new versions and servers are updated or added to this list. Sharedpoint with USG, CSG and ISG EOL spreadsheet https://uoe.sharepoint.com/sites/TechnologyEndOfLife2018 Current EOL technology register |
ASOR (Final Release / Handover) | Y | AG 05/07/19 | |
|
System Design Specification (SDS) |
Document complete and accurate.
Action: The Document must be copied to the Wiki |
ASOR (Final Release / Handover) |
N/A | Ron McLeod 11/06/2019 | |
|
System Description Document |
Document complete, accurate and it has been reviewed by Application Management
Action: The Document must be copied to the Wiki |
ASOR (Final Release / Handover) |
N/A | Ron McLeod 11/06/2019 | |
|
Scalability/Load Testing |
Adequate load testing has taken place. The results have been recorded and analysed to ensure that the application will cope with the anticipated load. |
ASOR (Final Release / Handover) |
n/a | ||
|
Performance |
The application has been tested against stated performance criteria. Performance has been assured by user and support staff testing. |
ASOR (Final Release / Handover) |
Y | Ron McLeod 26/06/2019 | No user complaint |
|
Source Code available in GIT
|
Source code has been secured in GIT and Production branch is up-to-date. Note that this applies to all new development. If the code was in SVN or VSS at the start of the project it must be migrated to GIT. Action: ensure Production Branch created and check that the branching structure conforms to the policy outlined here: https://www.wiki.ed.ac.uk/display/insite/Version+Control+Policy Where code is provided by a third party (e.g. supplier) it has been established who is responsible to maintain source code. |
DSOR (Final Release / Handover) |
N/A | Ron McLeod 11/06/2019 | SAAS solution |
|
Configuration Management Database |
The relevant details regarding new or changed infrastructure components have been added to the CMDB in unidesk |
ASOR (Release 1-n) |
Y | AG 05/07/19 | Added as Open Parking - Technical Service |
|
Change Control(s) |
A Change & Release record has been created in Unidesk for the LIVE implementation request and notified to GoCAB if necessary Action: Record Unidesk number |
ASOR / (Release 1-n) |
Y | Ron McLeod 26/06/2019 | C1906-152 |
|
Test Log Review |
A review of the test log (JIRA) has taken place to ensure all required actions have been completed. If this is not the case, then confirmation on criticality of outstanding issues and action plan for resolution is required. |
ASOR (Final Release / Handover) |
Y | Ron McLeod 26/06/2019 | Where are the test logs? |
|
Application Management Handover |
Handover to Application Management and Development team is completed or arranged. Action: record handover dates |
ASOR (Final Release / Handover) |
TAD required |
Any Firewall issues? How do you access new system and keep the old one running till December? |
|
|
Support Accounts |
Read access accounts or update current read access accounts have been set up for support staff(requires business owner approval) |
ASOR (Final Release / Handover) |
n/a | Ron McLeod 26/06/2019 | |
|
Password Manager (PMP) |
InfoKeep has been updated with all relevant account details including external supplier accounts |
ASOR (Release 1-n) |
n/a | Ron McLeod 26/06/2019 | |
|
Environment comparison |
Database comparison between TEST and LIVE (might be required before and after go-live) |
ASOR (Final Release / Handover) |
N/A | Ron McLeod 11/06/2019 | |
|
Client requirements |
Does the application have specific client requirements, such as JVM/JRE versions, JInitiator etc If so have these requirements been raised with Desktop services Wiki pages to be updated: [1] https://www.wiki.ed.ac.uk/display/insite/Corporate+applications+with+client+based+requirements [2] https://www.wiki.ed.ac.uk/display/insite/Client+side+requirements+for+co... |
ASOR (Release 1-n) |
N/A | Ron McLeod 11/06/2019 | |
|
Technologies |
Is there any new software or technologies involved? (Y/N) If yes state any additional actions taken to ensure adequate handover to the production support team |
ASOR (Release 1-n) |
SAAS | ||
|
Access outside University |
By default all web based applications are accessible outside University without use of VPN etc Wiki list If not accessible from outside University this needs to be approved by Production Management. |
ASOR (Release 1-n) |
Helen to check is this going through myed and ease? |
||
|
Vendor Access Required |
Does vendor require db/app access (Y/N) If yes, ensure access details are in TAD |
ASOR (Final Release / Handover) |
n/a | SAAS solution | |
|
Certificates |
All changes to certificates or new certificates for this service have to be added to the certificate master list. The certificate master list is being managed by Applications Management This includes TEST and LIVE certificates and records type of certificate and expiry dates. |
ASOR (Final Release / Handover) |
Details should be in TAD? | ||
|
Deployment Date(s) |
Agreed date has been confirmed that allows adequate time for completion of Acceptance Sign Off Review. |
ASOR (Final Release / Handover) |
Y | RM 25/06/19 | w/c 16th July |
|
Deployment Resources |
IS and business area resources required for deployment, including those needed for post implementation checking and sign off have been secured. |
ASOR (Final Release / Handover) |
Y | Ron McLeod 26/06/2019 | |
|
Deployment Ownership |
Responsibilities for managing the go-live, including: comms with service owner and end users, ensuring go live timescales are met, managing issues arising and managing comms between all teams involved in go live. |
ASOR (Final Release / Handover) |
Helen | ||
|
Service Announcement(s) |
A Service announcement has been raised with the agreed deployment date on the alert system:
http://reports.is.ed.ac.uk/alerts/
Service announcements should be raised by Project Manager 10 days before go live, but no later than 4 days. |
ASOR (Release 1-n) |
Y | RM 02/07/19 |
- C1906-152 |
|
Reporting and Analytics |
New BI Universes or substantial changes to Universes/report offerings need to be documented in the Information Portal managed by GaSP. https://www.wiki.ed.ac.uk/display/IP/Information+Portal+Home |
ASOR (Release 1-n) |
n/a | ||
| 24x7 monitoring setup | Consider if a new application needs to be added to 24x7 monitoring tool | ASOR (Release 1-n) | n/a |
Infrastructure checklist - Not applicable. New saas solution. New infrastructure not supported by IS.
|
Component |
Success Criteria |
Project Stage Required (Agile) |
OK (Y/N) | Reviewed by (date) | Outdstanding Actions (Who) | ||
|---|---|---|---|---|---|---|---|
|
Technical Architecture/Operational Document(TAD) |
Documentation complete and accurately reflects the environment subjected to UAT.
|
ASOR (Release 1-n) |
need exsiting TAD UPDATED | ||||
|
Security |
All security requirements, e.g. SSL encryption, IP based restrictions firewall requirements have been specified, tested and implemented in LIVE |
ASOR (Release 1-n) |
??? | ||||
| Default Deny |
Default deny has been enabled as outlined in the policy: https://www.wiki.ed.ac.uk/display/insite/Default+Deny+Policy Any exceptions must be noted in the TAD and signed off by Head of Production Services. |
ASOR (Release 1-n) | ??? | ||||
|
User Accounts |
User accounts exist and passwords have been added to PMP | ASOR (Final Release / Handover) | |||||
|
Patching |
Ensure that all applications have an agreed patching schedule and this schedule is agreed with service owners. Different technologies have different patching strategies: |
ASOR (Final Release / Handover) |
whats the patching schedule by vendor | ||||
|
Start/Stop scripts |
Are Server Start-up/Shutdown scripts in place? Including start-up procedure documented, enabled and tested |
ASOR (Release 1-n) |
|||||
|
Ports |
Port allocation file been updated:
https://www.wiki.ed.ac.uk/display/insite/Port+Allocation+on+Unix+Servers |
ASOR (Release 1-n) |
?? | ||||
|
Backup and Recovery |
All backups as noted in the TAD need to be confirmed operational.
A test recovery of user data needs to be done to validate the integrity of the recovery mechanism and process. The backup strategy should conform to the policy here: |
ASOR (Release 1-n) |
|||||
|
DR Copy |
DR copy to SECONDARY DB configured and tested (unless existing database which is already setup). |
ASOR/Release1 |
|||||
|
Logs |
For all logs the following is in place:
|
ASOR (Release 1-n) |
|||||
| Decommission | If project deploying new server make sure old servers are being decommission including removing passwords from PMP and patching restart Wiki | ASOR (Release n) | |||||
| Servers are being scanned by Nessus | Check that new and existing servers are being scan by Nessus | ASOR (Final Release / Handover) | |||||
|
Technology Management Handover |
Handover to Technology Management and Development Technology is completed or arranged. Action: record handover dates |
ASOR (Final Release / Handover) |
??? |
Support checklist
|
Component |
Success Criteria |
Project Stage Required (Agile) |
OK (Y/N) | Reviewed by (date) | Outdstanding Actions (Who) |
|---|---|---|---|---|---|
|
Support Agreement (including any charging arrangements) |
A support agreement OLA is in place for any new applications – including any hosting or support charges. Where external suppliers are involved an SLA should be in place as well.
Action: SLA moved to wiki:
https://www.wiki.ed.ac.uk/display/insite/SLA+repository+-+Applications+Management |
ASOR (Final Release / Handover) |
Y | RM 26/06/19 | |
| AppCatalogue updated |
For new and existing application update the Appcatalogue |
ASOR (Final Release / Handover) | Y | AG 05/07/19 | |
|
Time Recording Code |
A Time Recording code for the application, if required, has been confirmed and set up (in ASTA) Action: Does application require a separate entry for business area in ASTA |
ASOR (Final Release / Handover) |
Y | RM 26/06/19 | |
|
Disaster Recovery and Business Continuity |
Appropriate DR/BC provision is in place and has been fully tested. Application DR/BC details have been transferred to the DR Portfolio and DR level (1, 2 or 3) has been agreed |
ASOR (Release 1-n) |
n/a | ||
|
Test Environment |
An adequate TEST environment has been established for the application which may be used by support to test future changes prior to releasing these in the LIVE environment. |
ASOR (Release 1-n) |
TAD? | ||
|
Hardware and Software Licensing |
All required licensing is in place including maintenance/support arrangements with external suppliers. |
ASOR (Final Release / Handover) |
Managed by Estates | ||
|
Browser Compatibility |
Browser compatibility has been tested and compatibility information updated See for details |
ASOR (Final Release / Handover) |
? |
have browsers been tested? what is the vendors supported browsers |
|
|
Portal Compatibility |
Portal compatibility, where required, has been confirmed the Portals Service Owner. |
ASOR (Final Release / Handover) |
myEd? | ||
|
Help Desk |
The new application is recognised with the UniDesk (A business contact queue is defined where initial calls are raised with) |
ASOR (Final Release / Handover) |
Y | rm 25/06/19 | existing |
|
User Guide Documentation |
Appropriate documentation has been produced for users of the new application. |
ASOR (Final Release / Handover) |
y | Ron McLeod 26/06/2019 | |
|
Training Material |
Training material, if required, has been produced and is of an appropriate standard. |
ASOR (Final Release / Handover) |
y | Ron McLeod 26/06/2019 | |
|
Demonstration or Walkthrough |
Demonstration or walkthrough of the new application has taken place for other stakeholder. |
ASOR (Final Release / Handover) |
|||
|
Web Sites and Other Document Sources |
External and internal web sites have been reviewed to ensure that all application references are present, correct and up to date. |
ASOR (Final Release / Handover) |
Y | RM 02/07.2019 |